When a retrofit is the right answer

Fermentation never stabilises

Temperature does not hold above 55 °C, odour persists, or the cured material is still active when it reaches the granulator. Usually a turning, aeration or moisture problem rather than an equipment shortage.

Read more →

Output is below nameplate

The line runs at 60–70% of design rate because one step — usually screening, drying or bagging — was sized at nominal rate rather than with duty margin.

Read more →
02

Baseline measurement before design

  • Feedstock tonnage and moisture actually received over a two-week period, including peaks.
  • Fermentation temperature profile at three depths in the pile over a full cycle, with the turning record.
  • Moisture of cured material entering the processing line, measured daily.
  • Actual throughput at each process step, so the real bottleneck is identified rather than assumed.
  • Granule size distribution, granule strength and final product moisture.
  • Connected load and actual maximum demand, plus transformer and cable capacity headroom.
  • Downtime log: what stopped the plant, for how long, and why.
03

Retrofit options ranked by cost and disruption

UpgradeTypical lead timeDisruptionEffect
Operational fix — turning regime, moisture, aeration rateDaysNoneOften the largest single improvement in fermentation stability
Add screening or bagging capacity3–6 weeksLow, can be installed during normal stopsRemoves the most common bottleneck at modest cost
Add a second shaft or turner for the fermentation bay4–8 weeksLowShortens cycle or absorbs more feedstock
Convert open windrow to covered, aerated or in-vessel3–6 monthsMedium, phasedOdour control, weather independence, smaller footprint
Add granulation, drying and cooling4–7 monthsMedium to highChanges the product and the revenue per tonne
New parallel line6–10 monthsLow on the existing plantDoubles capacity without stopping production
04

The three constraints that decide what is possible

Building height. A dryer and cooler in series need vertical space and lifting access. If the existing building is 4.5 m to the hook and the new dryer needs 7 m of headroom, the retrofit becomes a building project as well.

Foundation capacity. Existing slabs were cast for the machines that were installed, not for heavier ones. We check dynamic loads and either spread them or cast new plinths — a decision that is far cheaper before equipment is specified.

Power headroom. A granulation and drying line adds 60–120 kW per tonne per hour of capacity. If the transformer has no margin, the retrofit needs an electrical upgrade first, and that is usually a utility lead time rather than a workshop task.

Retrofit an existing line

Send photographs of the existing plant, the equipment list and the last month of production data. We reply with the bottleneck analysis and the practical upgrade options.

FAQ

Plant engineering questions

Can a plant keep running during a retrofit?

Often yes, if the new equipment is installed in parallel and connected during a planned stop. Building work above an operating line is the exception and is scheduled with the customer's production calendar.

Our compost smells and never heats up. Is that a machine problem?

Usually not. The most frequent causes are low moisture, insufficient turning or aeration, a carbon-to-nitrogen ratio that suppresses microbial activity, or piles that are too small to retain heat. We measure the profile before recommending any equipment.

Is it worth adding a dryer, or can granules be sold at higher moisture?

That depends on your market and climate. Dryer-free granulation is possible with the right binder and a stable feedstock, but product moisture then depends on the fermentation and curing discipline. The design basis records which route is being designed for.

Can equipment from another manufacturer be integrated?

Yes. Retrofits commonly insert our equipment into an existing line. We measure the interface conditions — moisture, particle size, throughput, power and control signals — and design the connection rather than assuming the catalogue figures apply.

Send us your design basis

Tell us the feedstock, the daily tonnage and the product you want to sell. The engineering team replies with the plant configuration, the equipment scope and the information we still need before layout drawings start.

  • Feedstock profile — type, moisture, contamination, seasonal peaks
  • Capacity — t/day fresh material or t/h finished fertilizer
  • Product — powder, granules, bagged retail, bulk compost
  • Site — available area, power supply, water, access road

Prefer to talk first? WhatsApp +86 182 0399 3035 or email [email protected].

We use your details only to answer this enquiry. No newsletter, no third-party sharing.

WhatsApp
Request a proposal WhatsApp