Fermentation never stabilises
Temperature does not hold above 55 °C, odour persists, or the cured material is still active when it reaches the granulator. Usually a turning, aeration or moisture problem rather than an equipment shortage.
Read more →Temperature does not hold above 55 °C, odour persists, or the cured material is still active when it reaches the granulator. Usually a turning, aeration or moisture problem rather than an equipment shortage.
Read more →Adding granulation and drying to an existing powder line, reusing intake, fermentation, grinding and bagging, is often 40–60% of the cost of a new plant.
Read more →The line runs at 60–70% of design rate because one step — usually screening, drying or bagging — was sized at nominal rate rather than with duty margin.
Read more →Extraction, enclosure and biofiltration retrofits, plus operational changes to turning times and pile moisture.
Read more →| Upgrade | Typical lead time | Disruption | Effect |
|---|---|---|---|
| Operational fix — turning regime, moisture, aeration rate | Days | None | Often the largest single improvement in fermentation stability |
| Add screening or bagging capacity | 3–6 weeks | Low, can be installed during normal stops | Removes the most common bottleneck at modest cost |
| Add a second shaft or turner for the fermentation bay | 4–8 weeks | Low | Shortens cycle or absorbs more feedstock |
| Convert open windrow to covered, aerated or in-vessel | 3–6 months | Medium, phased | Odour control, weather independence, smaller footprint |
| Add granulation, drying and cooling | 4–7 months | Medium to high | Changes the product and the revenue per tonne |
| New parallel line | 6–10 months | Low on the existing plant | Doubles capacity without stopping production |
Building height. A dryer and cooler in series need vertical space and lifting access. If the existing building is 4.5 m to the hook and the new dryer needs 7 m of headroom, the retrofit becomes a building project as well.
Foundation capacity. Existing slabs were cast for the machines that were installed, not for heavier ones. We check dynamic loads and either spread them or cast new plinths — a decision that is far cheaper before equipment is specified.
Power headroom. A granulation and drying line adds 60–120 kW per tonne per hour of capacity. If the transformer has no margin, the retrofit needs an electrical upgrade first, and that is usually a utility lead time rather than a workshop task.
Send photographs of the existing plant, the equipment list and the last month of production data. We reply with the bottleneck analysis and the practical upgrade options.
Often yes, if the new equipment is installed in parallel and connected during a planned stop. Building work above an operating line is the exception and is scheduled with the customer's production calendar.
Usually not. The most frequent causes are low moisture, insufficient turning or aeration, a carbon-to-nitrogen ratio that suppresses microbial activity, or piles that are too small to retain heat. We measure the profile before recommending any equipment.
That depends on your market and climate. Dryer-free granulation is possible with the right binder and a stable feedstock, but product moisture then depends on the fermentation and curing discipline. The design basis records which route is being designed for.
Yes. Retrofits commonly insert our equipment into an existing line. We measure the interface conditions — moisture, particle size, throughput, power and control signals — and design the connection rather than assuming the catalogue figures apply.
Tell us the feedstock, the daily tonnage and the product you want to sell. The engineering team replies with the plant configuration, the equipment scope and the information we still need before layout drawings start.
Prefer to talk first? WhatsApp +86 182 0399 3035 or email [email protected].
Two or three details are enough to start — the engineering team will come back with the configuration and the missing design basis.