Remote or island sites
Where importing a construction team costs more than importing modules, and where the plant must be operational within a single season.
Grinding, screening, blending, granulation, cooling and bagging all fit into container frames or skids, pre-wired and pre-piped, tested in the works, then reconnected on site in days rather than months. What cannot be put in a container is the fermentation volume itself: composting needs residence time, and residence time needs space, whether that is a bay, a pile or a vessel.
The workable modular concept is therefore a hybrid: a locally built fermentation area — covered windrow, groove or a set of in-vessel tanks — connected to a containerised processing and bagging plant. That keeps the heavy civil work small while preserving the process control that product quality depends on.
Where importing a construction team costs more than importing modules, and where the plant must be operational within a single season.
Short leases, redevelopment plans or temporary waste contracts where the plant may need to move within a few years.
A 1 t/h modular line proves the market and the feedstock logistics before a permanent plant is committed.
Organic waste must be processed on site, and the fertilizer is used on surrounding land rather than sold at retail.
| Item | Conventional plant | Modular plant |
|---|---|---|
| Civil works | Large, site-specific | Slab and utility trench only |
| Site construction labour | Weeks to months, local skill dependent | Days, small crew |
| Weather risk during erection | High | Low — work happens inside frames |
| Relocation | Effectively impossible | Feasible in weeks |
| Unit capital cost | Lower per t/h | Higher per t/h, offset by civil and time savings |
| Expansion | Extend buildings | Add modules |
Tell us the site, the feedstock and how fast you need production; we return a module breakdown, the local scope you would build and a deployment schedule.
Only the fermentation vessel part — small in-vessel reactors can be transportable, which suits 0.5–2 t/h. Above that, fermentation volume grows beyond container scale and is normally built locally.
A level reinforced slab for the modules, a foundation for the fermentation area, drainage, and utility connections to the battery limit. Typically 10–25% of the civil scope of a conventional plant.
No — the process sections are the same equipment, sized for the same duty. The compromises are in operator space and maintenance access, which have to be designed carefully rather than assumed.
Four to ten weeks on site after the modules arrive, assuming the slab and utilities are ready. Fabrication and shipping remain the longer part of the programme.
Tell us the feedstock, the daily tonnage and the product you want to sell. The engineering team replies with the plant configuration, the equipment scope and the information we still need before layout drawings start.
Prefer to talk first? WhatsApp +86 182 0399 3035 or email [email protected].
Two or three details are enough to start — the engineering team will come back with the configuration and the missing design basis.