In-vessel composting system
Enclosed vessels and tunnels for fast, controllable, low-odour fermentation.
Read more →| System | Residence | Footprint for 100 t/day fresh | Labour | Odour control | Capital |
|---|---|---|---|---|---|
| Open windrow, turned | 25–35 days | 3,500–6,000 m² | High — turner plus loader | Difficult — extraction impractical | Low |
| Covered windrow, turned | 25–35 days | 3,000–5,000 m² | High | Moderate — building extraction | Low to medium |
| Groove / trench with turner | 18–25 days | 2,000–3,500 m² | Medium | Moderate — can be enclosed | Medium |
| Aerated static pile | 14–21 days | 1,500–2,500 m² | Low — no turning | Good — pile can be covered and extracted | Medium |
| In-vessel (tank / tunnel) | 7–12 days | 600–1,200 m² | Low, but disciplined loading | Excellent — closed process with treated exhaust | High |
Footprint and labour figures are planning values for a temperate climate and typical manure-based feedstock. In monsoon or cold climates the covered and in-vessel options gain further advantage.
Available area, distance to neighbours, prevailing wind, climate and the permitted operating hours eliminate two of the four systems immediately in most projects.
Wet slurry needs dewatering or a dry amendment before any system performs. Fibrous dry manure works in any system; wet sludge and food waste usually need enforced aeration.
A plant selling bulk compost can tolerate a longer, less controlled cycle. A plant selling bagged granules needs cured material with consistent moisture and maturity, which favours controlled systems.
Turning systems reward disciplined daily operation; aerated and in-vessel systems reward instrumentation and maintenance. Choose the system your team can actually run.
Turners, blowers, vessels, loaders and conveyors are selected to serve the system, not the reverse.
Thermophilic composting stabilises the material; curing matures it. Curing runs at lower temperature for two to six weeks with occasional turning, and it is where remaining phytotoxicity disappears and where moisture is brought to the value the processing line needs. Plants that skip curing produce material that continues to heat in the bag, generates condensation, and forms clumps in the granulator feed.
Design the curing area as a separate, covered, ventilated bay with enough volume for 2–4 weeks of production. It is one of the cheapest additions to a plant and one of the most reliable predictors of product quality.
Enclosed vessels and tunnels for fast, controllable, low-odour fermentation.
Read more →No turning, engineered air distribution, lower labour and good odour containment.
Read more →The classic turned-pile system and what it demands of the site.
Read more →Vertical and horizontal vessels: volume, aeration, discharge and installation.
Read more →Send the feedstock, the daily tonnage and the site constraints; we return a system recommendation with footprint, residence time and odour control scope.
Thermophilic fermentation of 7–12 days in a controlled vessel, 14–21 days in an aerated pile, or 18–35 days turned in bays or windrows, followed by 2–6 weeks of curing. The controlled systems are faster because aeration is enforced rather than periodic.
Ammonia means the carbon to nitrogen ratio is too low — usually a manure-heavy mix — or the pile is anaerobic in patches. Add a carbon source such as straw or wood chips and check that moisture and free air space allow air to move through the pile.
Three practical checks: temperature returns to ambient after turning, the material is dark and crumbly with an earthy smell and no recognisable feedstock, and a germination or maturity test on the finished material shows no inhibition. We specify the checks and the record sheet in the commissioning package.
Yes, but with provision. Piles lose heat from the surface, so deeper piles, covered bays or in-vessel systems are used, and the fermentation area is sized for the slower rate. Cold-climate plants usually favour in-vessel or covered bay systems for this reason.
Tell us the feedstock, the daily tonnage and the product you want to sell. The engineering team replies with the plant configuration, the equipment scope and the information we still need before layout drawings start.
Prefer to talk first? WhatsApp +86 182 0399 3035 or email [email protected].
Two or three details are enough to start — the engineering team will come back with the configuration and the missing design basis.