Capacity planning method
The full conversion method behind the planner, with a table by feedstock type.
Read more →Planning figures only. Fermentation days, footprint and utility demand follow the design basis of the specific project and must be confirmed by the engineering team before civil works are ordered.
The planner uses ranges, not measurements. Your real moisture, contamination, climate, labour cost and site shape will move every figure — sometimes by 30% or more. It is designed to tell you whether a project is broadly feasible and which variable is limiting, before you invest in engineering work.
What it will not do: quote a price, promise a throughput, or replace the mass balance. When you send us the same five inputs plus a feedstock sample and a site plan, we produce the real version.
The full conversion method behind the planner, with a table by feedstock type.
Read more →What the plot, buildings, hardstanding, drainage and utilities have to provide.
Read more →The four systems and how residence time and footprint trade against each other.
Read more →Design basis, mass balance and the drawing set that follows.
Read more →Send the planner output with your feedstock details; we reply with the engineering version, including the assumptions we would change.
It is a first-order planning tool. Footprint and freshwater figures are usually within 20–30% of a real design; throughput depends mostly on the moisture you actually achieve, which is why the mass balance and feedstock sample come next.
Because cost depends on the equipment scope, the automation level, local civil works, freight and currency. Padding figures belong in a commercial proposal issued against a defined scope, not in a planning tool.
Start with windrow if you have land and distance from neighbours, groove if space is tight, aerated static pile if labour is expensive, and in-vessel if you are in or near a settlement or in an extreme climate. Compare the footprint and residence outputs between options.
Take a screenshot or copy the figures into the enquiry form. When you submit them with your feedstock data, we reply with the engineering version and the assumptions we would change.
Tell us the feedstock, the daily tonnage and the product you want to sell. The engineering team replies with the plant configuration, the equipment scope and the information we still need before layout drawings start.
Prefer to talk first? WhatsApp +86 182 0399 3035 or email [email protected].
Two or three details are enough to start — the engineering team will come back with the configuration and the missing design basis.